Installation
Temperature resistance
-
Before installing the flooring it’s important to turn on the heat progressively from 10º to the maximum temperature for a couple of weeks, in order to dry the substrate completely before installing the flooring. Then place a perimeter joint, a joint on the threshold, and joints in areas where the passage of hot water and cold water intersect because the flooring is most subject to compression and contraction.
Was this helpful you for solve?